How Hardscape Projects Are Phased

Key takeaways

  • Underground work and structure come first.
  • Surfaces and furniture come last.
  • A master plan makes every phase fit.

Plan the whole yard

A master plan shows every piece in its place, so phase one never has to be torn up for phase two.

Underground first

Drainage, grading, utilities and walls go in before the surfaces that cover them.

Surfaces next

Patios, walks and drives come after the structure and utilities.

Finishing touches

Fire features, lighting, plants and furniture can follow when the budget allows.

Related services

Questions about your own project? Call or text (615) 431-3789, or use the form below.

Ready to build?

Let's build your yard.

Tell us where the yard is and what you have in mind: a patio, a wall, a fire pit, a new driveway or a plan for the whole space. We read every message and reply with next steps and a time to walk the yard. In a hurry, call or text instead.

  • Your city or the address of the property and what you want to build. A few photos of the yard are plenty, and exact measurements are never required
  • Anything you saved from a Hardscape Lab tool or the hero, so we do not ask you twice
  • A yard walk at a time you choose, a written plan before any work starts, then a careful build on a proper base
Call or text(615) 431-3789

Your estimate request

Prefer to type? Text your request. We only use your details to respond to your request.