Key takeaways
- Underground work and structure come first.
- Surfaces and furniture come last.
- A master plan makes every phase fit.
Plan the whole yard
A master plan shows every piece in its place, so phase one never has to be torn up for phase two.
Underground first
Drainage, grading, utilities and walls go in before the surfaces that cover them.
Surfaces next
Patios, walks and drives come after the structure and utilities.
Finishing touches
Fire features, lighting, plants and furniture can follow when the budget allows.